Steps 22-24

Step 22. Check final position of shed on slab

Step 23. Bolt shed to floor using 6.5mm "dynabolts"

Step 24. Seal inside base frame with silicone

Back

Return to Site Map

HOME

This Site was created by
Missing Link Enterprises
Copyright The Shed Man Pty Ltd