
Steps 1-3
|
|
|
Step 1. Clear any grass, rubble etc from site Step 2. Spread and level yellow sand for floor base Step 3. Lay black plastic and paving slabs |
|
This Site was created
by
|
Missing Link Enterprises
|
|
|
Copyright The Shed
Man Pty Ltd
|
||